Thanks to the Morris Bank in Dublin construction has begun on the Hardy Smith House to have electric service in the entire house, heating and air throughout and a new bathroom done.
Since September of this year the work crews have been showing up everyday.
The first thing done was to start cutting the floor for heating and air vents. There was no heating and air in the house. Each room had a fire place for winter and in the heat of summer you just opened up the windows or put in a window air unit.
The electric work starts with putting in the electrical outlets in each room. Previous to the electric work done the only power came from a front pole with with power cords. So it gets kinda dark in parts of the house with no power cord :P
No comments:
Post a Comment